Jiangsu Sankon Building Materials Technology Co., Ltd.

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
Home ProductsAutoclaved Aerated Concrete Production Line

11kW Autoclaved Aerated Concrete Production Line

11kW Autoclaved Aerated Concrete Production Line

11kW Autoclaved Aerated Concrete Production Line
11kW Autoclaved Aerated Concrete Production Line 11kW Autoclaved Aerated Concrete Production Line 11kW Autoclaved Aerated Concrete Production Line 11kW Autoclaved Aerated Concrete Production Line 11kW Autoclaved Aerated Concrete Production Line

Large Image :  11kW Autoclaved Aerated Concrete Production Line Get Best Price

Product Details:
Place of Origin: CHINA
Brand Name: SANKON
Certification: ISO9001/CE
Model Number: CUSTOMIZED
Payment & Shipping Terms:
Minimum Order Quantity: 1SET
Price: USD1~4000/SET
Packaging Details: SUIT FOR SHIPPING
Delivery Time: 3MONTHS
Payment Terms: L/C, T/T
Supply Ability: 2000SETS/YEAR
Detailed Product Description
Name: Feeding Drawing Mechanism Type: Customized
Rated Voltage: 380V Certificate: ISO9001/CE
High Light:

SANKON Autoclaved Aerated Concrete Production Line

,

11kW Autoclaved Aerated Concrete Production Line

Autoclaved Aerated Coancrete Production-Feeding Drawing Mechanism

 

Application:

It is special equipment (see the picture) for hooking and pushing autoclave on the steam raising line.

11kW Autoclaved Aerated Concrete Production Line 0

Main technical parameter:

1.The length of the drawing mechanism can be made base on customer's requirement.

2.Weight:~1800 kg

3. Reducer (pre-curing)

Type:GR107-Y11-6P-78.57-M1-0

Output rotate speed:12.7r/min

Install type:M1

Rotate speed:1000r/min

Power:11kW

 

Structure:

It is composed of drive sprocket , driven sprocket, tension pulley. The trolley of the hook is composed of bearing, rolling wheel, hook body and shaft, etc.

 

Work Principles:

Switch on the power supply, the motor rotate to drive the sprocket, and the wiring line goes through the pulley to drag the drawing mechanism moving on the guide rail.

 

Trial running and maintenance:

1.Trial running

The hanger trolley runs stably on the guide rail.

2. Maintenance

Add Colloidal graphite oil on the wheel every week.

Contact Details
Jiangsu Sankon Building Materials Technology Co., Ltd.

Contact Person: admin

Tel: +8615006121086

Send your inquiry directly to us