Send Message
Jiangsu Sankon Building Materials Technology Co., Ltd. 86-0519-83996829 trade@cnsankon.com
L6440mm W1700mm  3800kg AAC Block Line Crane

L6440mm W1700mm 3800kg AAC Block Line Crane

  • High Light

    3800kg AAC Block Line Crane

    ,

    L6440mm AAC Block Line Crane

    ,

    W1700mm AAC Block Line Crane

  • Name
    Marshalling Sling
  • Type
    Customized
  • Rated Voltage
    380V
  • Certificate
    ISO9001/CE
  • Place of Origin
    CHINA
  • Brand Name
    SANKON
  • Certification
    ISO9001/CE
  • Model Number
    CUSTOMIZED
  • Minimum Order Quantity
    1SET
  • Price
    USD1~26000/SET
  • Packaging Details
    SUIT FOR SHIPPING
  • Delivery Time
    3MONTHS
  • Payment Terms
    L/C, T/T
  • Supply Ability
    1200SETS/YEAR

L6440mm W1700mm 3800kg AAC Block Line Crane

AAC Block Line Crane,AAC Production section cutting and grouping-Marshalling sling

 

Application:

The sling (see the picture) is a match equipment for autoclaved aerated concrete cutting machine. It is installed on the automatic billet shift machine, the lifting is controlled by the guide frame. It is a special tool to move the de-skin billet to the autoclave.

L6440mm W1700mm  3800kg AAC Block Line Crane 0

Technical parameter:

1.Maximum Size (Maximum)(including guide frame)

L:6440mm   W:1700mm   H:4810mm

2.Weight:3800㎏

 

Structure:

The sling is composed of a horizon beam, a vertical beam, a guide frame and a lifting unit.

The two beams are made of huge steel pipes, so it is featured of good stiffness, compact structure and it can be easily installed and debug.

Lifting device is located on the horizon beam and the guide unit is fixed on the vertical beam.

 

Working principle:

When the over-head hanger rope is lifted by the pulley wheel lifts, the guide unit will move along the frame and then the sling will go up and down.

 

Assembly:

Following procedure should be performed

1. To combine the horizon beam and upright beam t together.

2. To connect the guide frame to the automatic billet shift machine.

3. To combine guide device and its frame together

4. To assemble the lifting device and guide frame together

 

Pilot running and debugging:

1. Pilot running

The sling can go up and down smoothly and stably, without any abnormalities, no jamming and no swaying.

2. Debugging

a.If the horizon beam is not critical to the upstanding beam, a pad is needed.

b.The gap between the wheel and frame may be proper if it is swaying.

 

Maintenance and repair:

1.Maintenance:

a.Please remove the dust on the piston rod after work with cotton cloths and make sure it is reset.

b.To clean up the lifting device, guide unit without any waste left.

Repair:

Please check all fasteners to avoid any possible loose and change worn parts.

 

Cautions:

1.Please turn off the power after work

2.Please keep away when it is running.