Send Message
Jiangsu Sankon Building Materials Technology Co., Ltd. 86-0519-83996829 trade@cnsankon.com
  • High Light

    AAC Concrete Saw Trolley

    ,

    AAC Concrete Saw Trolley 380V

    ,

    AAC Concrete Cutting Trolley

  • Name
    Cutting Trolley
  • Rated Voltage
    380V
  • Brand
    SANKON
  • Certificate
    ISO9001/CE
  • Place of Origin
    CHINA
  • Brand Name
    SANKON
  • Certification
    ISO9001/CE
  • Model Number
    CUSTOMIZED
  • Minimum Order Quantity
    1SET
  • Price
    USD1~1000/SET
  • Packaging Details
    SUIT FOR SHIPPING
  • Delivery Time
    3MONTHS
  • Payment Terms
    L/C, T/T
  • Supply Ability
    2000SETS/YEAR

AAC Concrete Saw Trolley

Description:

Trolley: It is used to move the casting blank to the cutting work station and move the cutting waste to the mixing tank.

Waste clean trolley: It is a special trolley to move the cutting waste to the waste slurry mixing tank.

The guid rail is used only for the trolley running.

Cutting trolley, waste remove trolley

AAC Concrete Saw Trolley 0

Max outside size:

Length:4200mm Width:1650mm Height:1140mm

Weight:1500kg

Running reducer

Type:CRW77-20.8-YEJ5.5-B8-0°

Motor:

Type:CRW87-20.8-Y7.5-B8-0°

Cutting trolley: It is composed of trolley body, cutting frame, wheels and running device, etc. It is driven by the speed reducer.

The cutting trolley is special used for moving the cutting material, it is driven by the reducer.

Put the trolley onto the guild rail, and connect the wheel to the gearing, connect to the reducer power supply, it then can run.

The cutting trolley is run on the guid rail, and the 4 wheels run stably.

 

Maintenance and repair:

Maintenance

Clean the waste in each part after the each production shift

Remove the dust on the cutting wiring, scale, chain wheel and chain.

Add oil for the reducer per week.

Check the oil level of the reducer, and add it on time if it is lower the level.

Repair

Tighten the parts and replace each destroyed parts.

 

Packing & Shipping:

Package conforms to the requirements of customs.

 

After-sales service:
1.Provide engineers abroad installation and commissioning service.
2.Held online or site training for workers to ensure the safe operation.

3.Our expert will answer any inquiry within 24-48 hours and it will be solved as soon as possible.

4.We supplies the complete technical documents and the relative drawings of the electric components which were written in Chinese and English.

5.Service is available lifelong.